Do You Need a Signed Change Order to Have Lien or Bond Rights?

Engineered Life Safety System

On this episode, Alex will explain how to secure your lien and bond rights when doing change order work. We all know that obtaining a signed change order may in many instances be harder and take longer to accomplish than the changed work itself. As a result, you may get to the end of a job with a number of change orders that have yet to be signed.

Alexander Barthet is a board certified construction attorney in Florida and holds a B.S. in mechanical engineering. He manages The Barthet Firm, a construction law firm in Miami, and maintains a construction law blog at www.TheLienZone.com. He can be reached at 305-347-5295 or alex@barthet.com.