ICYMI: Don’t Make This 1 Mistake on Change Orders

Engineered Life Safety System

Because of the length of time it takes to complete a project, the number of parties involved, and the general unpredictable nature of construction work, it is rare that a contract for such work remains unchanged from start to finish. On this episode, Alex will give you some tips so dealing with the next change order isn’t such a gamble.

Alexander Barthet is a board certified construction attorney in Florida and holds a B.S. in mechanical engineering. He manages The Barthet Firm, a construction law firm in Miami, and maintains a construction law blog at www.TheLienZone.com. He can be reached at 305-347-5295 or alex@barthet.com.

The post ICYMI: Don’t Make This 1 Mistake on Change Orders appeared first on Miami Construction Lawyers.

Original Article


Comments are closed.